Semiconductor and Solar products focus.
- Applicable to any discrete process in manufacturing or business.
ManSim products were designed specifically to meet the stringent
requirements of semiconductor manufacturing, wafer sort, assembly, and
testing. ManSim products have also been applied to other industries
(printed circuit boards, solar products, fabless, cardboard packaging, machine shop,
etc.) and can be used to model white-collar processes.
|
|

|
|

|
|
- ManSim’s products are based on simulation models.


ManSim
Products are Dynamic, Discrete Event Simulation Planning Tools with the
Capability for Stochastic and Deterministic variables.
Static Models overestimate capacity
and understate cycle times which can
lead to shortages of equipment, high inventories and late shipments.
Static models are inadequate to
model the coordinated use of multiple resources
|
|

|
|

|
|

|
|
- During the life cycle of a production facility
The normal
life cycle of a production facility is the domain of ManSim products.
This includes initial design of the facility, facility ramp up, daily
scheduling, weekly/monthly order management, and needed manufacturing
improvements in the production facility’s operation so it can stay
competitive or lead in its market sector.
|
|

|
|

|
|

|
|

|
When to use
Type of
Simulation
|
Initial
Facility
Design
|
Facility
Ramp Up
|
Daily
Scheduling
|
Weekly &
Monthly
Order
Managemen
|
Ongoing
Facility and
Operational
Improvements
|
|
Capacity
Simulation
Products
|
ManSim/X
TestSim/X
|
ManSim/X
TestSim/X
|
|
|
ManSim/X
TestSim/X
|
|
Scheduling Simulation
Products
|
|
MS/X On Time
TS/X On Time
|
MS/X On Time
TS/X On Time
|
|
|
|
Planning
Simulation
Products
|
|
|
MS/X Planner
TS/X Planner
|
MS/X Planner
TS/X Planner
|
MS/X Planner
TS/X Planner
|
|
Each product uses
the same simulation engine allowing models and their associated
variables to be shared between the capacity, scheduling, and simulation
products.
|
|

|
|

|
|

|
|
use ManSim
Simulation Products?
ManSim Simulation Products meet these goals
Why - A need to
understand the constraints in manufacturing processes.
How - Discrete event simulation clearly shows the
ebb and flow of product queues and equipment activity over time with
sensitivity to product mix and volume variations. It will also show the
skill mix and quantity of personnel needed to support the product mix
and volume variations.
Why - A need to
meet order delivery dates at or near 100% Serviceability
How - The ManSim Order Mapper interacts with the
Simulation Engine, using the factory state, forecasts, and orders, and
iterates to optimize product start schedules to meet committed delivery
dates.
Why - A need to
reduce cycle time
|
|

|
|
|
|

|
|
How – Variations
in factory processes and the level of utilization significantly affect
cycle time. ManSim products can easily model the variation of the above
variables using stochastic and actual values.
Why - A need to
understand operational costs, compute revenue, and determine profit
How – Part costs are impacted by operator costs,
machine operation costs, and consumables needed. ManSim tracks part
costs by operation, and can calculate profit based on revenue gained
through completed parts. ManSim simulations will also quantify the
external equipment (jigs, fixtures, load boards, burn-in boards, etc.)
requirements needed for uninterrupted production at each operation.
|
|
|
|
|
|